GGR UNIC URW-095 Spider Crane Brings Christmas Cheer to Parliament
GGR Group was rocking around this Christmas tree in the Houses of Parliament recently as we helped spread a bit of festive cheer at one of London’s most iconic landmarks.
A UNIC URW-095 spider crane made a quick stop at Westminster Hall, the oldest Parliamentary building in London’s Westminster, to help put a 20 foot tall Christmas tree in pride of place ready for the holidays. The huge tree weighed in at over 100kg but was lifted with ease by the URW-095 thanks to its lifting capacity of almost one tonne.
Related Work
Tight Recess Glass Install
Glazing installed in a tight recess by GGR's GF42 Pick and Carry Crane.
Corner Glazing Units for art’otel
A Libro 3000 Overhang Beam with a Corner Lifter is used to install corner glazing units at art'otel.
Jurassic Mini Spider Crane
A UNIC URW-706-2 Mini Spider Crane installs a 1.5-tonne T-rex at a Leeds shopping centre.
Restricted Access on a Canal
The MCC1005 Mini Crawler Crane replaces a bridge at the Greenberfield Locks canal.
G150 working at Stansted Airport
Mini Crane Scales The Dizzy Heights Of Europes Tallest Building
Our compact and transportable UNIC mini spider cranes are taken to all sorts of lifting locations, but this UNIC URW-706 crane has surely gone to one of the most spectacular spots around as it sits at the very top of The Shard.